Welcome to the OPShots Aviation Gallery


Wallpaper format: 800 | 1024 | 1152 | 1280 | Send as Postcard

Airline / Aircraft Location and Date Photographer
Airport Buildings/Property
Airport Overview
Toledo - Executive Airport (TDZ/KTDZ)
USA - Ohio, January 15, 2017
Cole Goldberg
Contact
Registration/Serial No. | Remarks & Notes
None (cn None) An overview of the brand new fuel farm at TDZ with existing hangars behind. The new fuel farm project consisted of removing two existing underground fuel tanks, constructing a new concrete slab, and installing two new 12,000 gallon above ground fuel tanks. As well, draining was improved and power and control systems were re-established. The replacement project, which was estimated to cost $434,824, was initiated in May 2016.

No comments found
Post or read comments below for this photo Ads Help
Name
Rating
12345678910
Comment
Sum:
1 and 1 =